Commissioning checklist

Carbonated filler commissioning checklist.

Commissioning is the point where the specified machine, real product, real packaging and site conditions are brought together.

  • Have enough product for test filling.
  • Have correct bottles, cans, caps, lids and labels ready.
  • Prepare packaging for downstream checks.
Before commissioningCheck
ProductCorrect drink, chilled/prepared as required
ContainersCorrect samples and production quantity
ClosuresCaps, crowns, lids or ROPP closures available
UtilitiesPower, air, CO₂, water and drainage ready
OperatorsPeople available for training
RecordsFirst-run settings and checks documented
  • Check supply pressures and connections.
  • Confirm guards and emergency stops.
  • Brief operators on safe CO₂ handling.
  • Record acceptable fill level and foam behaviour.
  • Record cap torque or seam results.
  • Document cleaning and shutdown steps.

FAQs

Common questions.

Can commissioning happen without product?

Only limited dry testing can happen. Real product is needed to confirm carbonated filling performance.

Should operators attend commissioning?

Yes. Commissioning is also a key training opportunity.

What should be recorded?

Settings, quality checks, issues found and agreed operating procedures should be recorded.